M35-18 Dunrobin Bridge – Lake Meadowbank

None
Marine and Safety Tasmania logo

Mariners are advised that BridgePro Engineering undertaking maintenance works to the Dunrobin Bridge commenced on Monday, 26 February 2018 and concluding in May 2018.

A low level barge will be used to facilitate the works. The barge will have a marker buoy installed on either side of the works in the span in which it is operating. A flashing light will be fitted on the barge.

Vessel operators are requested to keep well clear of the barge and marker buoys.

Share via: Facebook, Twitter, or Email

← Back to the news